Suncoast 2 Florida's Turnpike

The Suncoast Parkway 2 is a four-lane toll facility that extends the existing Suncoast Parkway northward for 13 miles from US 98 to SR 44 in Lecanto. The project includes:

  • Constructing full interchanges at US 98 and W. Cardinal Street and a partial interchange at SR 44
  • One wildlife corridor and three wildlife culverts
  • 15 new bridges
  • Two all-electronic tolling gantries and equipment buildings
  • Related drainage, lighting, highway signing, traffic signalization, guardrail and sidewalk
  • The Suncoast Trail, part of Florida's Statewide Greenways and Trails System, will be extended to SR 44 and a pedestrian overpass constructed over US 98
Florida’s Turnpike Enterprise is constructing the Suncoast Parkway 2. The cost for this project is approximately $134 million. Work began in February 2018 and is expected to be completed in 2022. Funding is entirely based on Turnpike toll and concessions revenue.


Aerial Displays
Suncoast 2 Map
Interchange – US 98
Interchange – Cardinal Street
Interchange – SR 44
Section 1 - US 98 to Withlacoochee State Forest
Section 2 - W. Oak Park Blvd. to W. Cardinal St.
Section 3 – Mockingbird St. to W. Grover Cleveland Blvd.
Section 4 – Homosassa Trail to SR 44
Typical Section


For information about this project, contact Katie Mitzner, design public information officer, 407-264-3064 or or via e-mail at: Katharine.Mitzner@dot.state.fl.us.

The Suncoast Parkway 2 Phase 2 roadway will be a four-lane (two lanes in each direction) toll facility that extends from SR 44 to CR 486, a distance of approximately three miles. The project will evaluate the following:

  • Completing the interchange at SR 44 to accommodate northbound traffic movements. Construction for southbound traffic movements is currently underway as part of the Suncoast Parkway 2 from US 98 to SR 44.
  • An at-grade intersection at CR 486
  • One SR 589 mainline, All Electronic Tolling (AET) location
  • Related drainage, lighting, highway signing, traffic signalization, guardrail, and sidewalk.
  • The continuation of the Suncoast Trail, part of Florida’s Statewide Greenways and Trails System.

For information about this project, contact Katie Mitzner, design public information officer, 407-264-3064 or or via e-mail at: Katharine.Mitzner@dot.state.fl.us.

Suncoast 2 Map

Final Design Noise Study Report

FWC Explanation of Rights

Mailing List

Join our Mailing List
You can add your name to the project mailing list by filling out the form below.

Name
Address
City State Zip
Email Address
 

Send a Comment

If you would like to submit a comment or question about this project please complete the form below or send directly to info@suncoast2online.com.

Thank you.

Name
Address
City State Zip
Email Address
Message