Lessons Learned - Roadway *

* All links require Adobe Reader.  To download, click the icon.

 

04/28/04   Resurfacing Projects with Guardrail

12/14/04   Water table in close proximity to temporary pavement

12/14/04   Conflicts with underground structures/utilities

12/14/04   Permit not included in bid documents

12/20/06   Attenuators for temporary toll booths

12/20/06   Dredging included in general excavation quantities

12/20/06   Existing riprap was not shown on plans

12/20/06   Incorrect callout of right-of-way corner

12/20/06   Use of outdated right-of-way maps to prepare plans

12/20/06   Guardrail attenuator not in compliance with Standard Index

12/20/06   Removal of thermoplastic striping

12/20/06   Right-of-way shown and labeled twice along ramp

05/21/07   Cross-check of required pay items during quality control review

05/21/07   Area for retention pond not included

08/15/07   Shoulder ponding in bottom of vertical curve on roadway

08/15/07   Locating landfills in construction plans

08/15/07   Railroad coordination

11/16/07   Dowelled Transverse Concrete Construction Joint

12/06/07   Subgrade/Subdrainage Beneath Gantry Concrete Pavement

03/06/08   Reference Points

03/06/08   RFI Process

01/23/09   Plan Note Inconsistent with Lane Closure Analysis and Turnpike's Lane Closure Policy

01/23/09   Removal of Extra-Depth Asphalt in Area of Full-Depth Reconstruction

01/23/09   Pay Item for Special Guardrail Posts not in Summary of Pay Items

01/23/09   TCP and Transition to Existing Lanes

08/26/09   Soundwall Conflict

04/08/10   Toll Plaza TCP

10/18/10   Median U-turn

 

 